Projects Customers Type of Tests
Bangabandhu Sheikh Mujid Railway Bridge Construction Project Package – WD2
(Western Part of Civil Works), Bangladesh

2023

  • IHI-SMCC Joint Venture
  • Proof Stress Tensile & Elongation Test
  • Modulus Elasticity Test
  • Relaxation Test
  • PC Dust Dimension, Wall Thickness & Tolerance Test
  • Galvanized Zinc Coating Thickness Test
North–South Commuter Railway Extension (NSCR-Ex) Project, Philippines

2023

  • Italian-Thai Development Public Company Limited
  • Creep Test
  • Cylinder Test
  • Static Modulus Elasticity Test
FIP Testing for HM-120SC Segmental Construction Adhesive

2022

  • Shanghai Horse Construction Co. Ltd.
  • Gel Time (Pot-Life) Test
  • Open Time Test
  • Sag Flow Test
  • Angle of International Friction (Squeezeability) Test
  • Shrinkage Test
  • Water Absorption and Solubility Test
  • Heat Resistance Test
  • Compressive Strength Test
  • Instantaneous and Defered Modulus Test
  • Tensile Bending Strength (MOR) Test
  • Slant Shear Bonding Test
  • Shear Modulus Test
Blue Sea Daian, China Project
2022
  • JEKS ENGINEERING PTE. LTD
  • Cement Content Test
  • Original Water Content Test
  • Cement Aggregate Content Test
  • Chemical Composition Analysis (Cement, Fine and Coarse Aggregate)
Polymer Matric Composite Materials / Fibre Plate, India
2022 – 2023
  • The Bhor Chemicals And Plastic Pvt. Ltd.
  • Tensile Strength Test
  • Elongation Test
  • Tensile Modulus Test
Precast Segmental Girders for North–South Commuter Railway Project, Philippines
2021
  • Fosroc Sdn Bhd
  • Slag Flow Test
  • Gel Time Test
  • Open Time Test
  • Three-Point Tensile Bending Test
  • Compressive Strength Test
  • Heat Resistance Test
  • Slant Shear Bonding Test
Sikafloor 21 Purcem LP Properties Test, Indonesia
2021
  • Sika Indonesia P.T.
  • Abrasion Resistance Test
  • Coefficient of Friction Test
  • Coefficient of Thermal Expansion Test
  • Flexural Strength and Modulus Test
  • Impact Resistance Test
  • Identiation Hardness Test
  • Resistance to Thermal Shock Test
  • Sensory Evaluation Test
  • Water Absorption Test
PHM North SISI, Indonesia
2021
  • OAG Offshore Pipeline Services Sdn Bhd
  • Compressive Strength Test
HKPM, Hong Kong
2021
  • Green Arck Precast Sdn Bhd
  • Pull Out Test
  • Steel Test
North–South Commuter Railway (NSCR) Project, Philippines
Package CP01 (MalolosTutuban) – Elevated Structures, 6 Stations and Depot

2021 – 2023
  • Taisei – DMCI Joint Venture
  • Creep Test
  • Drying Shrinkage Test
  • Modulus Test
  • RCPT Test
Concrete Protective Coating of Taiwan Highway Projects, Taiwan
2021
  • Sika Taiwan Ltd
  • Behavior after Artificial Weathering Test
  • Bonding Strength Test
  • Carbon Dioxide Permeability Test
  • Crack Bridging Test
  • Liquid Water Permeability Test
  • Water Vapour Transmission Test
Bukit Tun Phase Development, Indonesia
2020 – 2021
  • OAG Offshore Pipeline Service Sdn Bhd
  • Thermal Conductivity Test
  • Tensile & Elongation Test for Moulding Plastic
CMC, Sri Lanka
2019 – 2023
  • JPC-Intan Sdn Bhd
  • Jacking Pipe Test
  • Liquid Penetration Inspection Test
MRT 7, Philippines
2018
  • Frey-Fil Corporation
  • Relaxation Test
La Pampilla, Peru Project
2018 – 2019
  • OAG Offshore Pipeline Service Sdn Bhd
  • Compressive Strength Test
Balagon, Indonesia
2018
  • OAG Offshore Pipeline Service Sdn Bhd
  • Compressive Strength Test
  • Water Absorption Test
WHB Project FEED (BDEP), Lumut, Negera Brunei
2017
  • JEL (Borneo) Sdn Bhd
  • MG4 Test
Al-Tour
2017
  • OAG International (Labuan) Ltd.
  • Compressive Strength Test
Hail Development Project, Abu Dhabi
2016
  • OAG International (Labuan) Ltd.
  • Compressive Strength Test
Mumbai-High South Redevelopment Phase 3, India
2016
  • OAG Offshore Pipeline Service Sdn Bhd
  • Compressive Strength Test
670MW Banten Coal Fired Power Plant, Indonesia
2016
  • PT. The Second Construction Engineering Third Engineering Bureau
  • MG4 Test
Wuhan Shangri-La Hotel Phase 2 Extension, China
2016
  • I Tech Project Management Sdn. Bhd.
  • MG4 Test
Brunei Temburong Bridge Project Package CC2 – Marine Viaducts, Brunei Darussalam
2016 – 2018
  • Daelim Industrial
  • Teca (B) Sdn Bhd
  • UEM Builders Sdn Bhd
  • Aggregate Test
  • Modulus of Elasticity Test
  • PC Strand Test
Banten Power Project, Indonesia
2015
  • Harbin Electric International (HEI)
  • China State Construction Engineering Corporation (CSCEC)
  • Core Test (Structure: Chimney)
Modernization of Brunei International Airport Terminal, Brunei Darussalam
2014
  • TRC (B) Sdn. Bhd.
  • Covermeter Survey
  • Concrete Test
  • Steel Test
  • UPV Test